Week 2

NCN24

A Pictorial Record of the Construction of National Cycle Route 24 Through Radstock

Construction continues apace. Tarmac has been laid over most of last week's surface preparation. Route clearance has progressed to about 100 yards beyond last week's limit. It looks like the contractors are having to do a fair amount of earth moving at this point

This set of pictures were taken on Saturday 14th February 2004.

Click on a picture to enlarge

Radstock-Shoscombe

  At the access point from Tynings Hill, Radstock.
Alongside Mill Lane Industrial Estate
Behind the Mill Lane Industrial Estate. Surfacing contractors at work.
At the bottom of the footpath from Whitelands.
All tarmac'd between Whitelands footpath to Braysdown Bridge
Braysdown Bridge. Current limit of tarmac. The local scum-bags aren't giving up their favourite car-bonfire site quietly!
This picture was taken from the same spot as last week's limit of work.
This week's limit of operations, about 100 yards on from last week. Serious earth moving here.

Radstock-Mells Road Station

Work continues on the Meadow View to the railway route to Frome.

 

Back to Top of Page

Except where otherwise credited, pictures © Nigel Shoosmith. These pictures can be freely used with the proviso that acknowledgment is given to the photographer.